90
SPARC Enterprise T5120 and T5220 Servers Installation Guide • July 2009
4. Strip 5/16 inches (8 mm) of insulation from each of the wires coming from the
DC power source.
Do not strip more than 5/16 inches (8 mm) from each wire. Doing so leaves
uninsulated wire exposed from the DC connector after the assembly is complete.
FIGURE:
Stripping the Insulation From the Wire
5. Open the cage clamp for this section of the DC input plug by taking one of the
following actions:
■
Insert the tip of the cage clamp operating lever into the rectangular hole
directly above the hole in the DC input plug where you want to insert the first
wire. Press down on the cage clamp operating lever.
■
Insert a small slotted screwdriver into the rectangular hole directly above the
hole in the DC input plug where you want to insert the first wire, and push in
to open the cage clamp.
Figure Legend
1
Cable stripped to 5/16 in., or 8mm
Summary of Contents for SPARC Enterprise T5120
Page 1: ......
Page 2: ......
Page 6: ......
Page 22: ...xx SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 64: ...42 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 88: ...66 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 120: ...98 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 128: ...106 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 132: ...110 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 133: ......
Page 134: ......