Preparing for Installation
5
■
Workstation
■
Terminal server
■
Patch panel connected to a terminal server
Related Information
■
“Optional Component Installation” on page 5
Optional Component Installation
The standard components of the server are installed at the factory. However, if you
ordered options such as additional memory or PCI cards, these options will be
shipped separately. If possible, install these components prior to installing the server
in a rack.
If you ordered any options that are not factory-installed, see the
SPARC Enterprise
T5120 and T5220 Servers Service Manual
for installation instructions.
Note –
The list of optional components can be updated without notice. See the
product web pages for the most current list of components supported in the server.
Related Information
■
SPARC Enterprise T5120 and T5220 Servers Getting Started Guide
■
SPARC Enterprise T5120 and T5220 Servers Getting Started Guide (DC)
■
SPARC Enterprise T5120 and T5220 Servers Service Manual
ESD Precautions
Electronic equipment is susceptible to damage by static electricity. Use a grounded
antistatic wriststrap, footstrap, or equivalent safety equipment to prevent
electrostatic damage (ESD) when you install or service the servers.
Summary of Contents for SPARC Enterprise T5120
Page 1: ......
Page 2: ......
Page 6: ......
Page 22: ...xx SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 64: ...42 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 88: ...66 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 120: ...98 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 128: ...106 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 132: ...110 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 133: ......
Page 134: ......