Contents
vii
▼
To Boot the Solaris Operating System
61
▼
To Avoid Booting the Solaris Operating System at Startup
▼
▼
Verifying System Functionality
67
67
▼
68
71
▼
Installing the Servers With the Express Rail Rackmounting Kit
73
Slide Rail Assembly Notes for the Express Rail Rackmounting Kit
Installing the Servers in a Rack With Express Rails
▼
To Install the Slide Rail Assemblies
76
▼
To Insert and Lock the Server in the Rack
Installing the Cable Management Arm
Assembling and Installing DC Power Cables for the SPARC Enterprise T5120
Requirements for Servers With DC Input Power
DC Supply and Ground Conductor Requirements
86
Overcurrent Protection Requirements
Assembling and Installing the DC Input Power Cables
▼
To Assemble the DC Input Power Cables
88
▼
To Install the Strain Relief Housings
93
▼
Summary of Contents for SPARC Enterprise T5120
Page 1: ......
Page 2: ......
Page 6: ......
Page 22: ...xx SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 64: ...42 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 88: ...66 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 120: ...98 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 128: ...106 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 132: ...110 SPARC Enterprise T5120 and T5220 Servers Installation Guide July 2009 ...
Page 133: ......
Page 134: ......