- (01-05) -
2-2. UTZ-BD035B
NO.
Parts Name
Qty.
Material
Remarks
1 Frame
1 Galvanized sheets
2 Adapter
4 ABS
3 Electrical Equipment Box
1
4 Inspection Cover
1 Galvanized sheets
5 Fan
2 ABS
6 Motor
2
7 Heat Exchange Element
2 Special paper + Resin
8 Filter
2
Nylon-Polyester Fiber Collection Efficiency AFI 82%
9 Damper
1
10 Damper Motor
1
11 Ceiling Suspension Fixture 4 Galvanized sheets
BE CAREFUL OF DEWING AND
FROSTING
As shown in the Figure, suppose a high temp absorbing air condition
A and a low temp absorbing air condition B are plotted on the air line
figure, then a high temp air A is heat-exchanged by the unit and goes
out of the saturation curve as shown by Point C.
In this case, the unit will be dewed or frosted.
To aboid this, you are required to heat a low temp air B up to B’ so as
to get C’ below the saturation curve, before using the unit.
saturationcurve
Dry-bulb temperature(˚C)
Absolite humidity
(kg/kg’)
C’
C
B
B’
A
REFERENCE SKETCH
Pipe Hood
Outside Intake Duct
Ceilling Suspension Bolts
Supply Air Duct
EA
(Exhaust
Air)
OA
(Outside intake Air)
RA
(Room Air)
SA
(Supply Air)
Inside Supply Opening
(Supply/Exhaust Air Grill)
Room Intake Opening
(Supply/Exhaust Air Grill)
Room Intake Duct
Heat Insulation Material
Exhaust Air Duct
The two outside ducts(the Outside Intake Duct and the
Exhaust Duct)must be insulated to prevent condensation.
(Material;Glass wool, Thickness;25)
Duct size (Nominal Diameter): ø150
The above dimensions do not include the thickness of
the insulasion material on the unit body.
978
②
⑤
⑥
⑩
⑨
①
⑦
⑪
804
600
112
580
112
EA
OA
(Exhaust Air)
(Outside Air)
Maintenance Space
Inspection Opening □450
(For the inspection of the filters, heat exchange elements, fans, motors, and damper)
4-13×30 Oval hole · Suspension Fittings
19
860
19
RA
SA
(Room Air)
(Supply Air)
An inspection opening is necessary to
clean the heat exchange element and
filter once or twice a year.
317
247
182
159
35
80
④
⑧
③
1050
470
70
70
Wiring Diagram
Earth Terminal
Ø162
Ø144
122
157