Figure. 4 - Typical Installation
F03164
B oiler blowdown valve
D
H
Drain
Overflow to
drain
Blowdown
Separator
Vent
Make-up feedwater supply
Stainless steel
feedwater and
condensate
return tank
Note
:
A break tank may be required depending
upon Local Water Authority bylaws
Overflow
Flexible
connector
Condensate return
Feedwater
pump
Feedwater
non-return
valve
(to be installed below
boiler water level)
Flanged connection
20J - 60J only
Clean-out door
Draught stabiliser
(when fitted)
Standard boiler trim
supplied with boiler
Flue
Cowl
D = Diameter of flue
H = 1.5 X D
Feedwater isolation ball valve
Pipe safety valve
to a safe area,
using unions and
drain as required.
Steam supply
Flue spigot
Water column
blowdown line
Strainer
Isolating gate/ball valve
Plugged drains
Boiler Water Level
Vent to
Atmosphere
Summary of Contents for J Series
Page 2: ...JGASUK IOMM 2015 2 Fulton Ltd Page II ...
Page 54: ...JGASUK IOMM 2015 2 Fulton Ltd Page 48 APPENDIX A ...
Page 58: ...JGASUK IOMM 2015 2 Fulton Ltd Page 52 APPENDIX A ...
Page 60: ...JGASUK IOMM 2015 2 Fulton Ltd Page 54 ...
Page 62: ...JGASUK IOMM 2015 2 Fulton Ltd Page 56 ...