JGASUK-IOMM-2015-2
Fulton Ltd
Page 46
MAINTENANCE - 4
V
ertical Steam Boiler - Daily and W
eekly T
ests
Boiler Number:
Model:
Fuel:
Day
1
2
3
4
5
6
7
Date
1.
V
isual Inspection
of
pipework
and
fittings
for
signs
of
leakage
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
2.
Pump Check
, Feed pump, start/stop
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
3.
First Low W
ater Level
, Burner cut-out and alarm sound
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Note:
*Additional tests to be completed on the 7th day
4.
Second Low W
ater Level
, Burner cut-out alarm sound.
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
*10.
Flame failure device tested.
Y -
N
5.
Blowdown, Boiler
Duration seconds.
Self Monitoring Controls (if fitted)
Test T
ime.
6.
Blowdown, W
ater Column
Duration seconds.
*1
1. First Low W
ater Level
Burner cut-out and alarm sound
Y -
N
Test T
ime.
7.
Blowdown, W
ater Level Gauge
Duration seconds.
*12. Second Low W
ater Level
Burner cut-out alarm sound
Y -
N
Test T
ime.
Pressure gauge
reading for blowdown tests.
*13. Pressure gauge reading.
Boiler water and water treatment values must be
within known tolerances of the datum.
8.
Boiler W
ater
.
datum value.
TDS.
reading
datum value.
PH
reading
9.
W
ater T
reatment.
datum value.
reading
Operator Signature:
T
est Results and actions taken
Day
1.
sig.
Day
5.
sig.
2.
sig.
6.
sig.
3.
sig.
7.
sig.
4.
sig.
7+.
sig.
Log examined by:
Date:
Summary of Contents for J Series
Page 2: ...JGASUK IOMM 2015 2 Fulton Ltd Page II ...
Page 54: ...JGASUK IOMM 2015 2 Fulton Ltd Page 48 APPENDIX A ...
Page 58: ...JGASUK IOMM 2015 2 Fulton Ltd Page 52 APPENDIX A ...
Page 60: ...JGASUK IOMM 2015 2 Fulton Ltd Page 54 ...