APPENDIX - E
Systems that return for example very little condensate during the day, but a high proportion at
night, are almost impossible to control with any real accuracy. At best a compromise calibration
will be achieved, where too much blowdown at times may be the penalty.
When installing and commissioning a new Automatic TDS Control Blowdown System, it must be
accepted that the calibration will be a reiterative process, requiring continual sampling, testing,
and re-calibration until stable system operating conditions are achieved.
When purchasing an Automatic TDS Control Blowdown System from Fulton, the
equipment would normally be supplied with the controller wired and fitted to the boiler
control panel, with all the other parts supplied loose for piping and wiring on site by
others, unless agreed otherwise in our order acknowledgement.
Further re-calibration will be required until the water treatment regime has been established, and
“typical” water conditions have been achieved. Routine calibration checks will be required as part
of the site maintenance and water treatment monitoring.
The equipment, staff training required to carry out TDS sampling, and calibration can be provided
by Fulton if required. In order to achieve the maximum benefit from the installation of an
Automatic TDS Blowdown System, it is strongly recommended that site personnel be provided
with the necessary equipment, and training in order for them to fully understand the function of
the system, and the possible consequences of their actions.
Note: Where Automatic TDS Blowdown systems are provided as part of a skid mounted or packaged plantroom
system, they will be fully installed piped and wired.
e.g. Hourly blowdown rate required to maintain a boiler TDS of 2000 with a feedwater TDS of 200 = 12%
For a 1000 kg/h boiler 125 kg/h (125 l/h) of blowdown is required.
From Fig. 39 TDS Graph 1
Figure. 40 - TDS Graph 2
Summary of Contents for J Series
Page 2: ...JGASUK IOMM 2015 2 Fulton Ltd Page II ...
Page 54: ...JGASUK IOMM 2015 2 Fulton Ltd Page 48 APPENDIX A ...
Page 58: ...JGASUK IOMM 2015 2 Fulton Ltd Page 52 APPENDIX A ...
Page 60: ...JGASUK IOMM 2015 2 Fulton Ltd Page 54 ...
Page 62: ...JGASUK IOMM 2015 2 Fulton Ltd Page 56 ...