4x
Pegs
18
1. Move into selected
suitable location with
adequate fall zone.
(refer to page 4).
2. Hammer in pegs x4.
19
Page 18
FLIP ASSEMBLY OVER
SECURE TO GROUND
CRITICAL : ENSURE YOUR FRAME IS 100% SQUARE AND LEVEL (AS PER PAGE 6)
BEFORE MOVING ONTO THE REST OF THE ASSEMBLY
180º
1. With 2 people flip the assembly
over on its base plates.
2. Check that it is square
and level.