background image

Instructions

MINIPORT CN-15MP

and CN-20MP

                                                                                  

CONTRACTOR SERIES SmartSequencer

C                  US

15 AMP

MINIPORT

120 VAC, 50/60 Hz

MAX LOAD 15A

POWER

EXTREME VOLTAGE

CLASS 2 WIRING 

  FORCE 

OFF

P

P

S

S

SECONDARY

LINK

SMARTSEQUENCING                               

OUT

IN

+12V

STAT

REM

GND

DLY OUT

 REMOTE 

PORT

PRIMARY

LINK

BYPASS

120 VAC 

   /60/HZ

    A MAX.

15 AMPS

PUSH TO RESET

C                  US

CN-15MP

120 VAC 

   /60/HZ

    A MAX.

120 VAC 

   /60/HZ

    A MAX.

C                  US

20 AMP

MINIPORT

120 VAC, 50/60 Hz

MAX LOAD 20A

POWER

EXTREME VOLTAGE

CLASS 2 WIRING

 

  FORCE 

OFF

P

P

S

S

SECONDARY

LINK

SMARTSEQUENCING                               

OUT

IN

+12V

STAT

REM

GND

DLY OUT

 REMOTE 

PORT

PRIMARY

LINK

BYPASS

C                  US

CN-20MP

CN-15MP

Contractor Grade Power Management with 
SmartSequencing™ Technology 

Features: 

SmartSequencing™ 

technology allows large complex A/V systems to 

be safely power cycled on and off sequentially, with the press of a button.

Extreme Voltage Shutdown (EVS)

 with safeguards against operation 

during under and over voltage conditions.

Security

 features include cover shield to prevent tampering with switch 

settings.

Forced Off

 immediate shutdown: for safety and fire ordinance compliance.

Multi-Color LED

 Indicators for status functions.

2 Power Outlets

 on 1 bank providing 1800 Watts of AC power (CN-15MP) 

and 2400 Watts of AC power (CN-20MP).

CN-15MP 

– 10 ft. Power Cord 14AWG

CN-20MP 

- 10 ft. Power Cord 12AWG

 

15 Year Limited Product Warranty

CN-20MP

CN-15-20MP-DIN-00020-A

Summary of Contents for CONTRACTOR MINIPORT CN-15MP

Page 1: ...P A S S C U S CN 20MP CN 15MP Contractor Grade Power Management with SmartSequencing Technology Features SmartSequencing technology allows large complex A V systems to be safely power cycled on and o...

Page 2: ...g power to the amplifiers When shutting down the A V system a sequencer will turn off the system in the reverse order hence the amps will be turned off first and then the signal processing equipment w...

Page 3: ...urrent loop In situations where power sequencing is critical or more than one AC electrical circuit is utilized wiring Furman SmartSequencing products in series is simple fast and reliable EVS EXTREME...

Page 4: ...the manufacturer 10 Refer all servicing to qualified personnel Servicing is required when the unit has been damaged in any way or fails to operate 11 WARNING Do not use power cord as the main power d...

Page 5: ...ON 12V OFF GND ON MOM MNT PRI SEC EVS AUTO MANUAL 6 7 8 9 1 2 3 4 5 6 7 8 9 ON FOR REFERENCE ONLY ABBREVIATED DESCRIPTIONS AS SHOWN ON THE PRODUCT NOT FOR SETTING S INSTRUCTIONS EXAMPLE 1 DIAGRAM SMA...

Page 6: ...A EXAMPLE 3 DIAGRAM LARGE LEGACY UPGRADE EXAMPLE 4 DIAGRAM LARGE SET UP PRIMARY CONTROLLED VIA RS 232 P P S S CN 1800S 12 STAT REM GND UNIT 3 SECONDARY INTERFACE NO NC C FORCE OFF FORCE OFF P P S S CN...

Page 7: ...o the Secondary IN of the next downstream sequencer A Furman SmartSequencing chain communicates using a bucket brigade technique A Primary Unit communicates to the first Secondary Unit downstream by s...

Page 8: ...control system is either inaccessible or commanding the outputs to an OFF state It should be noted that the FORCE OFF and EVS conditions have priority over the BYPASS switch and if either of these co...

Page 9: ...will be triggered when the short between the two FORCE OFF pins is removed If a FORCE OFF is triggered the FORCE OFF message will be propagated to all SmartLink connected devices The power to all of t...

Page 10: ...ate as a Secondary Sequencer 8 1M 1 2 3 4 5 2M 4M N O N C 12V ON 12V OFF GND ON MOM MNT PRI SEC EVS AUTO MANUAL 6 7 8 9 1 2 3 4 5 6 7 8 9 9 1M 1 2 3 4 5 2M 4M N O N C 12V ON 12V OFF GND ON MOM MNT PRI...

Page 11: ...utlet If power is provided to the outlet the LED will illuminate green If the Miniport is operating under safe power conditions and no utility fault conditions exist the POWER LED will remain steadily...

Page 12: ...ect the signal processing equipment to the Mini ports near the beginning of the chain and the Amplifiers to the sequenc ers nearest the end of the chain This will ensure that the power to the signal p...

Page 13: ...lative Humidity User Interface Thermal Circuit Breaker Bottom panel pushbutton CN 15MP only Front panel diagnostic indicators Primary link Secondary link Power Extreme Voltage Side Panel DIP Switches...

Reviews: