2. WIRING
2-7
5. Unfasten the sealing nut and lock nut from the supplied super gland. As shown
below, pass the cable through the sealing nut, super gland, hole in the unit and
the lock nut.
6. Fasten the lock nut to fix the super gland to the unit.
7. Fasten the sealing nut into the super gland. The gap between the sealing nut end
and the super gland should be 4 mm. The fastening torque is 1.8 - 2.0 N m.
8. Position the cable so its vinyl sheath lies in the cable clamp. Use the supplied ca-
ble clamping plate to secure the cable.
Lock nut
Super gland
Cable for external KP
(
MPYC(SLA)-4)
Sealing nut
4 mm
Secure cable with cable clamping plate.
Summary of Contents for DFF-3D
Page 1: ...MULTI BEAM SONAR DFF 3D OPERATOR S MANUAL www furuno com Model ...
Page 10: ...SYSTEM CONFIGURATION viii This page is intentionally left blank ...
Page 14: ...1 INSTALLATION 1 4 Unit of measurement Top millimeter Bottom inch ...
Page 16: ...1 INSTALLATION 1 6 This page is intentionally left blank ...
Page 36: ...3 INITIAL SETTINGS 3 10 This page is intentionally left blank ...
Page 54: ...4 OPERATION 4 18 This page is intentionally left blank ...
Page 68: ...APPENDIX 4 INSTALLATION OF TRANSDUCER TM54 AP 12 This page is intentionally left blank ...
Page 71: ...D 1 20 Sep 2016 H MAKI 20 Sep 2016 H MAKI 20 Sep 2016 H MAKI 20 Sep 2016 H MAKI ...
Page 74: ...INDEX IN 2 Z Zoom display 4 8 ...