26
2. Cable between transceiver unit, junction box and
processor unit (TTYCY-19S)
1) Transceiver unit/junction box
shield
Anticorrosive
sheath
Cable
clamp
Vinyl
sheath
Insulating
tubing
FV1.25-4
5 10
Taping
Rubber
gasket
Washer
Armor
Note:
1.
Unravel
shield
only
near
terminal
strip.
2.
Fold
back
armor
onto
washer
and
insert
between
washer
and
gland.
Figure 5-2 Cable fabrication
2) Processor unit
Cores and shields are fabricated the same as on
transceiver unit/junction box side. To ground the cable,
remove paint from the armor and set the armor in the
cable clamp.
Cable
clamp
Figure 5-3 Cable fabrication
Summary of Contents for DS-50
Page 1: ......
Page 3: ......
Page 4: ...ii ...
Page 5: ......
Page 6: ......
Page 7: ......
Page 9: ......
Page 10: ......
Page 13: ......
Page 15: ...9c ...
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 32: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 45: ......
Page 46: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 63: ......