1.1.4 Installing hull unit on retraction tank
After welding the retraction tank and allowing sufficient time for cooling, install the hull unit
as follows:
1. Clean the hull unit flange, the O-ring and O-ring groove. Coat them with a slight amount
of grease. Place the O-ring in position on the tank flange.
2. Orient the hull unit so that the bow mark (inscribed) on its flange points toward the ship’s
bow. Note that heading adjustment is required if the bow mark is not facing the ship’s
bow.
3. Confirm that the O-ring is in position. Place the hull unit on the tank.
4. Coat every washer, nut and bolt with a slight amount of grease to ease removal. Fasten
the hull unit to the retraction tank with flat washers, spring washers and hex bolts.
5. Reinforce the hull unit against vibration by extending stays to the ship’s hull from the two
eye bolts at the top of the hull unit, referring to the procedure on the next page.
Nut
Spring
washer
Flat washer
O-ring
Hex bolt
RETRACTION
TANK
(16 places)
Hull unit flange
Tank flange
Nut
Spring washer
Flat washer
Flat washer
Hex bolt
O-ring
BOW mark
Installation of hull unit
Summary of Contents for FSV-84
Page 1: ...COLOR SCANNING SONAR FSV 84 www furuno co jp ...
Page 28: ...1 20 This page intentionally left blank ...
Page 48: ...2 20 This page intentionally left blank ...
Page 76: ...A 23 ...
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ...Nov 22 06 T Matsuguchi ...
Page 87: ...Nov 22 06T Matsuguchi ...
Page 88: ......
Page 89: ...D 16 ...
Page 90: ......
Page 91: ...Mar 14 07 R Esumi ...