1-14
1.6 Attachment Kit (option)
The attachment kit permits use of the tank for the CSH-80 series.
Attachment kit (Type: OP10-30, Code no.: 000-067-179)
Name Type
Code
No.
Qty
Insulation gasket (1)
SHG-0003-0
100-038-570
1
Insulation gasket (2)
MS-1000-68
000-857-221
16
O-ring C00117A
000-158-976-10
1
1. Clean the hull unit flange, the O-ring and O-ring groove. Coat them with a slight amount
of grease. Place the O-ring in position on the tank flange.
2. Lay the insulation gasket (1) on the top of the tank flange.
3. Orient the hull unit so that the bow mark (inscribed) on its flange points toward the ship’s
bow. Note that heading adjustment in the monitor unit is required if the bow mark does
not face the ship’s bow.
4. Confirm that there is no foreign material on the surface of the retraction tank flange, and
then do the following:
a) Place the hull unit on the tank.
b) Confirm that the O-ring and the insulation gasket (1) are in position.
5. Insert the insulation gasket (2) into the bolt holes of the tank flange.
6. Coat every bolt, washer and nut with a slight amount of grease to ease removal. Fit the
insulation gasket (2) into the bolt holes of the tank flange.
6. Fasten the hull unit to the retraction tank with insulation gasket (2), flat washers, spring
washers and hex bolts.
Summary of Contents for FSV-84
Page 1: ...COLOR SCANNING SONAR FSV 84 www furuno co jp ...
Page 28: ...1 20 This page intentionally left blank ...
Page 48: ...2 20 This page intentionally left blank ...
Page 76: ...A 23 ...
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ...Nov 22 06 T Matsuguchi ...
Page 87: ...Nov 22 06T Matsuguchi ...
Page 88: ......
Page 89: ...D 16 ...
Page 90: ......
Page 91: ...Mar 14 07 R Esumi ...