Site preparation
2-16
2.2.8
Condensation, water intrusion and deposits
In some weather conditions there may occur condensation inside the radome. The drain
tube is designed to lead any water away from inside the radome.
Observe the following guidelines for condensation and water intrusion:
1. If possible, install the radome such that direct spray of seawater is avoided.
2. Make sure the ADU’s drain tube is open and that there it free space between the drain
tube and the mounting surface so water can escape and there is ventilation for the
ADU.
3. Do not use pneumatic tools for cleaning the radome, especially at a short distance and
directly at the split between top and bottom.
4. Do not place the ADU close to a funnel, as smoke deposits are corrosive. Furthermore,
deposits on the radome can degrade performance.
Figure 2-14: Drain pipe with free space
Summary of Contents for FV-110GX
Page 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Page 16: ...xiv This page is intentionally left blank ...
Page 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Page 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Page 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Page 164: ...Supported commands C 10 This page is intentionally left blank ...
Page 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Page 166: ...OEM declaration D 2 D 1 OEM declaration ...
Page 173: ...OD 1 30 Jul 2018 H MAKI ...
Page 174: ...OD 2 30 Jul 2018 H MAKI ...
Page 175: ...OD 3 2 Oct 2018 H MAKI ...
Page 176: ...OD 4 2 Oct 2018 H MAKI ...
Page 178: ......
Page 186: ......