9. INSTALLATION OF VIDEO PLOTTER KIT
52
13. Attach the NH connector assy. (supplied) to the AIS cable and then connect
the NH connector to J4 on the RP Board.
20 mm
(1) Cut shrink tubing
in 20 mm lengths and
slip onto each wire.
(3) Heat shrink
tubing with
soldering iron.
Shrink tubing
(2) Solder connector
to signal cable.
Solder
HOW TO ATTACH NH CONNECTOR
RP BOARD
14P0371A/B
RD-A > 1 >
RD-B > 2 >
GND > 5 >
FA-100 AIS TRANSPONDER
Junction Box
J4
FR-2105 series
Solder
Armor
*
25
26
27
TD-A
TD-B
GNDiso
*
* = Clamp armor
by cable clamp.
Use JIS cable TTYCS-1Q or
equivalent. (See FA-100's
installation manual.)
Pair
Pair
Wiring between RP board and AIS transponder, attaching NH connector
14. Reattach the front panel to the display pedestal.
15. Update the program (if necessary) as follows:
a) Run the PC connection cable between the serial port (D-Sub 9 pin) on the
PC and J456 on the INT Board. See the figure on the previous page for the
location of J456.
1
2
3
4
PC
SERIAL PORT
J456 INT Board (03P9252)
RP-250
TX RS232C
RX RS232C
GND
RS232C RXD
RS232C TXD
GND
N.C.
3
2
5
4
6
7
8
* D-SUB9P connector
* XH4P connector
PC connection