2. INSTALLATION
2-18
How to attach connector N-P-8DFB
Outer Sheath
50
30
1
5
10
Armor Inner Sheath Shield
Cover with heat-shrink tubing and heat.
Cut off insulator and core by 10 mm.
Twist shield end.
Slip on clamp nut,
gasket and clamp as shown left.
Clamp Nut Gasket
(reddish
brown)
Clamp
Aluminum Foil
Trim shield here.
Fold back shield over clamp and trim.
Cut aluminum foil at four places,
90 from one another.
Fold back aluminum foil onto shield
and trim.
Trim aluminum
tape foil here.
Insulator
Expose the insulator by 1 mm.
Expose the core by 5 mm.
Clamp Nut
Pin
Solder through
the hole.
Slip the pin onto the conductor.
Solder them together through the
hole on the pin.
Insert the pin into the shell.
Screw the clamp nut into the shell.
(Tighten by turning the clamp nut.
Do not tighten by turning the shell.)
Shell
(Dimensions in millimeters.)
How to attach connector N-P-8DFB
•
Connect the DGPS antenna cable to the BEACON ANT port on the processor
unit. The standard cable is 15 m long. With the optional extension cable the
cable can be extended to 30 m or 60 m.
Summary of Contents for SC-120
Page 1: ...SATELLITE COMPASS SC 120...
Page 10: ...This page is intentionally left blank...
Page 14: ...This page is intentionally left blank...
Page 58: ...This page is intentionally left blank...
Page 71: ...APPENDIX A 5 NAV OUT1 Port Output drive capability Max 10 mA HDG4 NAV2 port RS 232C level...
Page 82: ......
Page 83: ......
Page 84: ......
Page 87: ...Takahashi T Takahashi T D 1...
Page 88: ...Takahashi T Y Hatai D 2...
Page 89: ...Takahashi T Y Hatai D 3...
Page 90: ...Takahashi T Y Hatai D 4...
Page 91: ...Takahashi T Y Hatai D 5...
Page 92: ...D 6...
Page 93: ......
Page 94: ......
Page 96: ......