FUSEBOX 2021 AFDD 6KA 1P+N B CURVE 6_40A TECHNICAL DATA
INSTRUCTIONS
What to do if a combined AFDD/RCBO trips
1
2
3
2 Installation
4
2a combined AFDD/RCBO range designed to fit FuseBox consumer units and modular enclosures.
5
Once faulty appliance has been identified DO NOT USE until it has been checked.
2b 35mm top hat din rail mounting.
6
Switch AFDD/RCBO to ON position.
7
If fault does not clear phone a qualified electrician to check installation
2d Cut, dress and connect cables as shown in the
wiring diagram.
Lin (Line) terminal connect to the bus bar.
Neutral flying lead to the neutral terminal bar (can be cut to size to suit).
Green LED on
Device operable
Red flash x1
Serial or parallel arc
detected
Yellow flash x2
Overvoltage >285V
3 Connections
Yellow flash x3
Residual current
detected
3a
Before powering up the circuit check all connections are TORQUED.
Red LED on
Self test failed
NO LED
No supply voltage
4 Testing
Operation of the TEST button on combined AFDD/RCBO
Environment
WASTE ELECTRICAL PRODUCTS SHOULD NOT BE DISPOSED OF IN HOUSEHOLD WASTE.
RCBO TEST
CONTACT YOUR RETAILER OR LOCAL AUTHORITY FOR RECYCLING INFORMATION
0.5IΔn
RCBO will not trip
1Δn
RCBO must trip within 300ms
5IΔn
RCBO must trip within 40ms
sales@fusebox.co.uk
Switch AFDD/RCBO to ON position and connect 1 appliance at a time to see which one trips the device.
LED Indication (table)
Connections
1a AFDD/RCBO must be installed by a qualified electrician in accordance with the current
IET Wiring Regulations BS 7671.
●●
○
●●
○
●●
○
●●
○
●●
○
●
●
○
●
○
●
○
●
○
●
○
●●●
○
●●●
○
●●●
○
●●●
○
●●●
○
When newly fitted systems do not trip on the TEST button or using the MFT the problem is
normally caused by an earth to neutral fault on the circuit (PME supply).
Installers can easily check the AFDD/RCBO by removing the LOAD connections on the device
and applying power. If the TEST button works the fault is in the circuit.
Combined AFDD/RCBO ARE MANUFACTURED IN ACCORDANCE WITH
IEC 61009-1
AND
MUST BE TESTED TO THIS SPECIFICATION USING A CALIBRATED TEST METER.
●
4a
CONNECTIONS TO THE AFDD/RCBO DO NOT REQUIRE TO BE DISCONNECTED IF THE
LEVER IS IN THE “OFF” POSITION FOR IR TEST.
4b On completion of the installation, it must be tested in accordance with the latest edition
of the IET Wiring Regulations for Electrical Installations (BS 7671).
Reset tripped AFDD/RCBO to
ON
position
Note LED indication - see table below
Loose connections cause fires!!!!
1b Total load must not exceed the rating of the AFDD/RCBO or any additional limitation.
2c Clip securely on to the din rail making sure the din rail clip at the bottom is pushed in,
locking the AFDD/RCBO onto the din rail, ensure lever is in the OFF position.
Connect the load to the L OUT and N OUT terminals at the top of the AFDD/RCBO and the
Load earth to the terminal bar.
If AFDD/RCBO trips again then disconnect all appliances connected to this circuit.