Your Solar Light
You Will Need
Operation
For First Time Use:
Fully charge the battery before first use.
Charge under direct sunlight in the <OFF>
position for 2 days.
STEP 1:
Turn the nut on the back of the
light in a counter clockwise direction to
remove.
STEP 2:
Carefully remove the back cover of the
light.
STEP 3:
With the back cover removed, locate the
ON/OFF switch on the lower right hand
side. Move the switch to the right (ON
position). When movement is detected,
the light will switch to full power for
about 25 seconds, before returning to
normal level once again.
Installation (Standard Wall Mount)
STEP 1:
Using the wall mount bracket as a guide, select desired
installation location.
STEP 2:
Mark the holes where you will need to pre-drill for screws or
wall anchors (if required).
STEPS 3 & 4:
Pre-drill holes for screws and use wall anchors as
necessary (if required).
STEP 5:
Secure screws through corresponding holes in wall mount
bracket.
STEP 6:
Line up the hole at the end of the wall mount bracket with the
bottom of the security light.
STEP 7:
Tighten machine screw until secure.
Using the adjustment screw on the side of the
wall mount bracket, adjust the angle of the light
as required and tighten to secure in the desired
position.
2
3