V
FUTABA 9Z
THE UNOFFICIAL WORKSHOP MANUAL
WARNING:
THE INFORMATION IN THIS MANUAL IS FOR INFORMATION PURPOSES ONLY AND MAY BE INCORRECT, CAUSE DAMAGE
TO YOUR RADIO OR INJURY TO YOURSELF AND OTHERS. IF YOU USE THIS MANUAL YOU DO SO SOLEY AT YOUR OWN RISK.
www.jamesandtracy.co.uk
Copyright 2012 jamesandtracy.co.uk
Page 67 of 84
Stage 3 Reassembly:
1.
Complete in reverse order to disassembly.
2.
Fit the side(s) being careful not to trap ribbon cables, but do not tighten the retaining
Allen key screws.
3.
“Snap-Slide” the corner covers into place. The corners first “snap” into place by
pushing them down, and then you slide them forward into position (see Figure 66).
CORNER
SNAP!!!
SLIDE
Figure 66 How the corners "Snap-Slide" into place
4.
Hold the case together checking the fit of parts and then tighten the Allen key
screws.
Stage 3 reassembly is complete when both sides and corners have been refitted.
5.4. Stage 4 – LCD Panel
Warning: There are some ribbon cables that can become caught during disassembly
and reassembly. Keep a sharp eye out and poke them back into place with a non-
metallic object or a screwdriver whose tip has been protected with insulating tape. Also
be very careful that no ribbon cables become lodged over screw holes. Putting a screw
through a ribbon cable is the fastest way to trash your transmitter.
NOTE:
Stage 4 is an example of a stage where you can partially complete Stage 3 if
desired. You need only remove the bottom Allen screws retaining the sides in Stage 3 if
you wish, and then partially lever out the sides as in Figure 67. However, better access
is provided if both sides are removed and Stage 3 is completed.