14
BOILER K
Original Instructions—rev.2011—in compliance with the paragraph 1.7.4 of the
Machinery Directive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25065
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Select the
LOCKING JAWS
according to the diameter of the pipe and install them on the expansion shaft as
shown in the picture.
While holding the three
LOCKING JAWS
you have just mounted, unscrew the
VANE E
-
XPANSION NUT
in order to let them enter their seat. If the procedure is correctly made the locking jaws should have a little play.