15
BOILER K
Original Instructions—rev.2011—in compliance with the paragraph 1.7.4 of the
Machinery Directive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25065
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Screw back on clockwise the vane expansion bush all way down and then the vane expansion nut.
While keeping the machine in axis with the pipe, insert the
SHAFT in the pipe
(about 15
-
20mm)
Firmly screw clockwise the
VANE EXPANSION NUT.