46
BOILER K
Original Instructions—rev.2011—in compliance with the paragraph 1.7.4 of the
Machinery Directive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25065
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
In the rear part of the locking device you shall now insert the stem and the two grub screws as shown in the
picture making sure not to move the expansion shaft.
Screw back on the vane abutment bush and the vane abutment cap counter
-
clockwise.
2
1
3