40
3
S01
M01
1
L06 or L06A
L05D
L05D
2
S01
M01
3
L05D
L04A
L04A
S01x2pcs
S04x2pcs
L05D
1
4
3
L05D
1
L22
L22
2
L22
L04A
L05D
4
W08
S04/M01
L04A
L04A
Close the window vents, then adjust W06 and W08
to the correct positions and secure W08.
W06
Ensure 2 bolts are inserted in the
bolt channel for the W08 handle.
Finally install the L22B to the roof of the greenhouse.
Install the L04A vent frame profile and the W08 handle frame profile.
Handle frame W08 is not required if auto openers are installed.
Install L04A and L05D at the same time.
When installing L05D ensure that you leave one bolt in the bolt channel for L22.
Install the L22 ridge and eaves struts.
The L22 struts are fitted horizontally at the ridge and diagonally at the eaves.