Procedure b)
The by-pass line is outside the acceptance field; the following message is seen on the
display panel:
BYPASS LINE VOLTAGE FAIL or SWBY OFF
1.
open all the switches on the device (SWIN, SWOUT, SWBY and the battery cabinet
disconnectors/fuses). The control panel will remain off.
2.
before closing switches SWMB and connecting the loads, ensure that both the frequency and voltage of
the supply line are sufficient to power the connected loads.
N.B.: After carrying out the operations indicated above, personnel must wait around ten minutes for the
capacitors to discharge before working on the inside of the LIBRAPRO.
After the maintenance operations have finished, restart the UPS.
Close SWIN, SWBY, SWOUT on all the UPSs.
Close the disconnector or the fuses on the battery cabinets
Check that all the parallel-connected UPS are on.
Open all disconnector SWMB.
After a few seconds all the UPS will return to NORMAL OPERATION.
Insertion and removal with UPSs operating (hot swap)
The hot insertion and removal of the UPS can only take place if the system is configured with the
RJ45
female/RJ45 female
shielded adaptor cable
(as shown in the figures below).
The hot insertion and removal of the UPS makes technical support easier and improves the reliability of the system.
With this procedure it is not necessary to shut down all the UPSs in order to add or remove a unit.
Hot insertion and removal can only be done on systems comprising UPSs with the following characteristics:
The UPS system must be prearranged with a distribution panel (for power connections)
The UPS system must be prearranged with a RJ45 female/RJ45 female shielded adaptor cable (not provided with the
UPS)
.
All the UPSs in the system must have the same firmware version.
Example of hot insertion
A)UPS parallel cable type
RJ45
B) RJ45 female/RJ45 female
shielded adaptor cable
UPS
BY-PASS CABLE
phase II Insert the new UPS
(power connections in the
distribution panel) and keep it
switched off.
UPS 3: SW1 cont position.
Phase III
Remove
adaptor B and insert the new
UPS instead of the adaptor
.
UPS 3
A
UPS 1
A
UPS 2
A
I
II
III
B
UPS 1
UPS 2
UPS 3
UPS 1
UPS 2
Summary of Contents for LibraPro
Page 2: ...Pag 2 57 0MNLIBRAPROK10NPENUA 01...
Page 6: ...Pag 6 57 0MNLIBRAPROK10NPENUA 01 This page is left blank intentionally...
Page 25: ...0MNLIBRAPROK10NPENUA 01 Pag 25 57 This page is left blank intentionally...
Page 35: ...0MNLIBRAPROK10NPENUA 01 Pag 35 57 This page is left blank intentionally...
Page 51: ...0MNLIBRAPROK10NPENUA 01 Pag 51 57 This page is left blank intentionally...
Page 53: ...0MNLIBRAPROK10NPENUA 01 Pag 53 57 This page is left blank intentionally...