Configuring G-SPEED Studio XL
G SPEED
STUDIO
XL
with Thunderbolt™
p. 45
Choose an
End On
option:
• No end date or perpetual
• End after a specific number of activity actions
• Run until date from the drop-down menus
For Redundancy Check, choose:
• Auto Fix
option – Attempts to repair the problem when it finds an error. Check to enable.
• Pause on Error
option – The process stops when it finds a non-repairable error. Check to enable.
• Select LD
– Check the boxes for which logical drives should run the redundancy check.
Check at least one logical drive.
Click the
Save
button.
To return to currently running background activities, click the
Background Activities
button.
Changing Background Activity Schedule
To change an existing scheduled background activity:
1. Click on the
Background Activities
icon.
2. Click the
Scheduler
button. The list of scheduled background activities will appear.
3. Mouse-over the background activity, then click the
Settings
button.
4. Make settings as needed.
Choose the option for the activity you want:
• Media Patrol
• Redundancy Check
• Spare Check