Requirements
3.2 Mounting
Installation dimensions for SECURY 19 EK / 19 EK EVP/ 19 S / 19 S EVP
Installation and milling dimensions, as well as approved door hardware,
strikers, latch&deadbolt strikers and one-piece strikes can be found on the
installation drawings included in the delivery.
We would be happy to provide you the drawings, if needed.
Before installation
of the multi-point lock in the door leaf, make all
fastening holes and passages for hardware, door closers, etc.
Install the cable so that it cannot be damaged. The cable must not touch
the connecting rods!
Install hardware with a mechanism to hold them up if lever handles are to
be monitored.
If you use a cable duct, install it on the hinge side of the door to avoid
damage to the cable at any door position.
To permit unhinging of the door leaf, the connection of the cable duct to
the connecting cable on the hinge side must be easy to release.