16.2 CENTRAL HEATING SYSTEM
This Commissioning Checklist is to be completed in full by the competent person who commissioned the heating system as a
means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for
future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not
affect statutory rights.
Commissioned by (PRINT NAME)
Registered Operative ID Number
Company name:
Telephone number:
Company address:
Commissioning date:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
Building Regulations Notification Number (if applicable)
ALL INSTALLATIONS
What is the heating water thermostat set temperature?
ºC
Time and temperature controls have been fitted in compliance with Part L of the Building Regulations?
Yes
Type of control system (if applicable)
Y plan
S Plan
Other
If “other” selected above, please provide details
Boiler interlock
Provided
Thermostatic radiator valves
Fitted? Not
required?
Automatic bypass to system
Fitted? Not
required?
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed
Yes
Has the heating system discharge been connected and terminated correctly?
Yes
The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions?
Yes
What system cleaner was used?
What inhibitor was used?
Quantity
Litres
Central heating flow temperature?
Degrees
ºC
Central heating return temperature?
Degrees
ºC
Are all energy sources fitted with a cut out device?
Yes
No
Has the expansion vessel or internal air space been checked?
Yes
No
The system has been installed and commissioned in accordance with the manufacturer’s instructions
Yes
The system controls have been demonstrated to and understood by the customer
Yes
The manufacturer’s literature, including Installation Checklist and Service Record, has been explained and left with the customer Yes
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm satisfactory demonstration and receipt of manufacturer’s literature)
*All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a competent persons Scheme.
A Building Regulations Compliance Certificate will then be issued to the customer.