GABRIEL KERAMIK AB
14
9
10
11
21
22
23
Assembly
Set outer ring (9) with mortar.
Level vertically and horizontally.
Set the “church roof” (10).
Level vertically and horizontally.
Place a thin strip of insulation, 2–3
mm, between the block and outer
ring to prevent soot accumulation.
Set the “flame protection” block
(11) with mortar.
Level vertically and horizontally.
All manuals and user guides at all-guides.com