GABRIEL KERAMIK AB
STUDIO2 • 11
min.
500
953 mm
8A
12
13
1030 mm
9
min.
500
14
7
Ø 630 mm
Ø 680 mm
14
Assembly
Set the top of the firebox
block (9) with mortar.
Set the fourh firebox block (8A)
on top of the third one. Make sure
that no mortar falls between the
blocks.
Level vertically and horizontally.
Cut off the insulation.
Before continuing above
the firebox opening,
construct a prop to sup-
port both
the outer
ring and
the firebox
top block as
shown in
the picture.
The support
will also
be of help
when tiling
above the
firebox. Keep the support
in position till the next day
or even longer.
Note! Clean off mortar leftoers.
Plain with a radiator brush.
Set the outer block (7) in mortar.