7
Rev 1/23
GB751SH INSTALLATION TOOL S/N: 1364 AND ABOVE
PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
PRINCIPLE OF OPERATION
Images may not reflect actual tool
When the lever is depressed, the pressurized air inside of the tool is released allowing spring pressure to move the valve spool assembly
causing the air to be redirected. The air is directed to the top of the air piston assembly, moving it in a downward direction. The air
below the air piston assembly is then directed through the valve sleeve and exhausted out of the bottom of the tool. Simultaneously,
the piston rod assembly connected to the air piston assembly is also moving down, forcing hydraulic oil up and into the front side of
the head cylinder assembly, causing the piston to move to the rear of the head cylinder assembly. The internal components of the
attached nose assembly are also moving with the piston to start the fastener installation. When the fastener installation is completed,
the lever is released. Air pressure is then built up inside of the handle assembly causing the valve spool assembly to return to its
original position and reversing the sequence directing air pressure to the rear of the head cylinder assembly, causing the piston to
move to the forward position.
Pressurized Oil
Unpressurized Oil
Pressurized Air
Unpressurized Air
Air exhaust
Air exhaust
PULL Cycle
RETURN Cycle
Air Piston moves down
Air Piston moves up
Air exhaust
Piston Rod Assembly
moves down
Piston Rod Assembly
moves up