10
en-us
Installation Procedure
2.
Insert the VV 200 010/020 connection strip (mounting
accessories) into the cut-out on the worktop.
3.
Insert the downdraft ventilation into the cut-out on the
worktop.
4.
Press the connection strip firmly against the
appliance; you should hear the appliance's clamp
springs clicking into the recesses in the connection
strip.
5.
Install the other appliances and connection strips.
6.
Insert the metal grease filter.
7.
Put the filter cover on.
FOLFN
FOLFN