3
CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
2 OPERA
2 OPERA
2 OPERA
2 OPERA
2 OPERATOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMATION
TION
TION
TION
TION
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
7 F
7 F
7 F
7 F
7 FAUL
AUL
AUL
AUL
AULT FINDING
T FINDING
T FINDING
T FINDING
T FINDING
CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
Impor
Impor
Impor
Impor
Important Information
tant Information
tant Information
tant Information
tant Information -----------------------------------------
-----------------------------------------
-----------------------------------------
-----------------------------------------
----------------------------------------- 4
Section 1 Intr
Section 1 Intr
Section 1 Intr
Section 1 Intr
Section 1 Introduction
oduction
oduction
oduction
oduction
1-1 Introduction ---------------------------------------------- 5
1-2 System Layout ------------------------------------------- 8
1-3 Parts Supplied------------------------------------------- 11
1-4 The Electrastream System ------------------------------- 12
1-5 Tri Core Heater Operation -------------------------------- 13
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Controls
ols
ols
ols
ols
2-1 System Control ------------------------------------------ 14
2-2 Electrastream Control Unit ------------------------------- 16
2-3 Shut Off Valves ------------------------------------------ 20
2-4 Temperature & Pressure Relief Discharge ---------------- 22
2-5 Thermostatic Mixing Valve ------------------------------ 22
2-6 Servicing ------------------------------------------------ 22
Section 3 T
Section 3 T
Section 3 T
Section 3 T
Section 3 Technical Information
echnical Information
echnical Information
echnical Information
echnical Information
3-1 Specifications ------------------------------------------- 23
3-2 Dimensions --------------------------------------------- 25
3-3 Wiring --------------------------------------------------- 29
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
4-1 Building Control ----------------------------------------- 31
4-2 Electrical ------------------------------------------------ 31
4-3 Hot Water System --------------------------------------- 33
4-4 Heating System ----------------------------------------- 37
4-5 Expansion Discharge ------------------------------------ 40
4-6 System Pressure ---------------------------------------- 43
4-7 Electrastream Connections - ---------------------------- 44
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
5-1 Commissioning ----------------------------------------- 47
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
6-1 Routine Service ----------------------------------------- 50
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
7-1 Fault Finding -------------------------------------------- 52
Health & Safety
Health & Safety
Health & Safety
Health & Safety
Health & Safety ------------------------------
------------------------------
------------------------------
------------------------------
------------------------------ Inside Front Cover
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
4 INST
4 INST
4 INST
4 INST
4 INSTALLA
ALLA
ALLA
ALLA
ALLATION
TION
TION
TION
TION
IMPORTANT
BEFORE STARTING THE INSTALLATION OF THE ELECTRASTREAM CHECK ALL COMPONENTS HAVE
BEEN DELIVERED AND ARE IN SATISFACTORY CONDITION - Refer to 1-3 .
HEAL
HEAL
HEAL
HEAL
HEALTH & SAFETY
TH & SAFETY
TH & SAFETY
TH & SAFETY
TH & SAFETY
19
Note:-
* The electricity supply company has to
make special arrangements to the
property’s electrical supply to enable
Electrastream to be used during both ‘off-
peak’ and ‘normal’ tariffs- consult the
installing electrician.
OPERA
OPERA
OPERA
OPERA
OPERATOR CONTROLS 2
TOR CONTROLS 2
TOR CONTROLS 2
TOR CONTROLS 2
TOR CONTROLS 2
‘Boost
’ can be used at any time during Economy or *Normal Tariff to provide heating
and hot water.
To turn hot water and heating OFF during ON periods (auto) press
twice. It will
require switching to Auto again when required.
To turn heating only OFF during ON period (auto) and during ‘Boost’ press
. It will
require switching to Auto again when required.
To turn hot water only ON during OFF periods (auto) press
. It will require switching
to Auto again when required.
To turn hot water and heating ON during OFF periods (auto) press
then
. Both
will require switching to Auto again when required.
Note:-
Self Test
After 3am each day the unit carries out a
self test period for approx. 30 minutes.
This can be overridden if required.
2-2.7 Setting Heat and Hot Water Requirements
Figure below shows a 24 hour clock with typical use of the Electrastream during ‘Off-
Peak’ economy 10 settings.
IMPORTANT
Operating the Electrastream during
normal tariffs will increase running
costs.
Start 1 - 03.00 (3am)
Stop 1 - 05.00 (5am)
Start 2 - 14.00 (2pm)
Stop 2 - 16.00 (4pm)
Start 3 - 20.00 (8pm)
Stop 3 - 21.30 (9.30pm)
All times fall within Economy Tariff
22222
Summary of Contents for Electrastream
Page 55: ...55 ...