25
INST
INST
INST
INST
INSTALLA
ALLA
ALLA
ALLA
ALLATION 4
TION 4
TION 4
TION 4
TION 4
4-4
Larger Systems
For larger systems two or more accumulators and cylinders can be linked together.
For mor
For mor
For mor
For mor
For more information consult GAH (HEATING PRODUCTS) LIMITED.
e information consult GAH (HEATING PRODUCTS) LIMITED.
e information consult GAH (HEATING PRODUCTS) LIMITED.
e information consult GAH (HEATING PRODUCTS) LIMITED.
e information consult GAH (HEATING PRODUCTS) LIMITED.
Fig. 4-4a T
ypical Multi System Layout
FOR REFERENCE ONL
Y
WATER SOFTENER
HTPV
ACCUMULATOR 1
INCOMING
MAINS
SUPPL
Y
ACCUMULATOR 2
HTPV
BALANCED COLD SUPPL
Y TO TAPS
HOT SUPPL
Y TO TAPS
CYLINDER 1
CYLINDER 2
EXPANSION DISHARGE
BOILER FL
OW
BOILER RETURN
CYLINDERS CONNECTED VIA SECONDARY RETURN POR
T
44444