6. SAFETY MEASURES.

The use of this equipment requires a maximum amount of responsibility with respe ct to their use and  maintenance. 

Read this safety chapter carefully as well as the rest of the instructions manual. The correct use of the equipment will 

de pe nd on this. 

For your safety and that of others, remembe r that: 

ANY PRECAUTIO N MAY BE INSUFFICIENT!

ANY PRECAUTIO N MAY BE INSUFFICIENT!

ANY PRECAUTIO N MAY BE INSUFFICIENT!

ANY PRECAUTIO N MAY BE INSUFFICIENT! 

The welding equipment referred  to in this manual are electrical. It is important therefore to 

observe the following safety measures. 

Any work on the equipment must only be  carried out by spe cialists.

The  equipment  must  be   connected  to  the  earth  connection  and  this  must  always  be

effective.

The equipment must not be  located in a da mp place.

Do  not  use  the  equipment  if  the  welding  or  supply  cables  are  da maged.  Use  original

spa res.

Make sure that the pa rt to be  welde d makes pe rfect electrical contact with the equipment earth.

During any maintenance ope rations or when dismantling any element from the inside  of the machine, this must

be  disconnected from the electricity supply.

Do not touch the equipment switches when carrying out a welding ope ration.

Never lean directly on the work pa rt. We will always work with protection gloves.

Any work on the welding guns and earth clamps will be  done with the equipment disconnected (OFF Position (O)

on  the  on/off  switch).  Do  not  touch  the  electrically  active  pa rts  (electrode -holde r  clamp,  earth  clamp,  etc.)  with

your ba re hand.

The pa rt to be  worked  on should  be  cleaned  from possible grease or solvents as these may 

de compose during the welding process giving off fumes which could  be  very toxic. This can 

also  occur  with  those  materials  which  have  some  kind  of  surface  coating  (zinc-plated, 

galvanised,  etc.).  Avoid  inhaling  the  fumes  given  off  in  the  process  at  all  times.  Protect 

yourself from the fumes and  metal dust which can be  given off. Use quality approved  anti-

fume  goggles.  Work  with  this  equipment  must  be   carried  out  in  places  or  working  posts 

where there is suitable air renewal. If welding processes are carried out in closed places the 

use of suitable fume extractors is recommende d. 
In  welding  processes,  the  electric  arc  formed  gives  off  infrared  and  ultraviolet  type  

irradiations:  these  are  harmful  for  the  eyes  and  skin,  so  these  areas  must  be   suitably 

protected with gloves and suitable clothing. The eyes must be  protected with goggles with an 

quality  approved  protection  system with a protection inde x of at least 11.  With electric arc 

welding machines use protection shield  for the eyes and  face. With electric cutting machine 

use protection goggles. Always use quality approved protection elements. Never use contact 

lenses.  They  may  adhere  to  the  cornea  due  to  the  great heat given off during the process. 

Bear in mind that the arc is conside red to be  da ngerous within a 15-metre radius. 

Cast material projections are given off during the welding process so due precautions must 

be   taken.  There  must  be   a  fire-extinguisher  near  to  the  working  area.  Do  not  keep 

inflammable material or explosives near to the working post. Prevent fire caused  by spa rks 

or  slag.  Use  quality  approved  footwear  for  this  type   of  ope rations.  Use  approved  auditive 

protectors in case of too high noise.  

Never direct the pa th of an electrode -holde r clamp towards pe ople.  

In  environments with a high risk of electrical shock, fire, proximity of inflammable products 

or height, observe relative national and international provisions. 

Summary of Contents for SMART 200 MP

Page 1: ...LE AUTOMATIQUE DE SOUDAGE MIG MAG Ref 223 00 200MP SMART 200 MP 230V 50 60Hz E ESTE EQUIPO DEBE SER UTILIZADO POR PROFESIONALES EN BENEFICIO DE SU TRABAJO LEA ATENTAMENTE ESTE MANUAL GB THIS EQUIPMENT...

Page 2: ...NG MODES 16 3 START UP OPERATION AND ADJUSTMENT CONTROLS 17 3 1 OPERATING CONTROLS 17 3 2 MIG MAG WELDING Installation and start up 18 3 3 TIG WELDING Installation and start up 19 3 4 MMA WELDING Inst...

Page 3: ...r it without any additional charge unless the damage caused to the product is the result of accidents improper use negligence inappropriate accessories unauthorized servicing or modifications to produ...

Page 4: ...m2 1A V 3 m Con clavija Conexi n m quina gas 2 m racor Cable masa Ruleta 30 0 8 1 0 mm V RECO MENDADO S RECO MENDADO S RECO MENDADO S RECO MENDADO S PARA USO MEDIANTE PRO CESO MIG MAG PARA USO MEDIANT...

Page 5: ...uientes elementos INSTALACI N DO M STICA CLAVIJA MANGUERA BASE Y PROTECCI N EL CTRICA SCHUKO 2P T 16A BASE 2P 16A TT INTERRUPTOR MAGNETOT RMICO 2P 16A 230V INTERRUPTOR DIFERENCIAL 2P 25A 300 mA INSTAL...

Page 6: ...EG RESE QUE LA TENSI N DE LA RED COINCIDE CON LA ESTABLECIDA EN LA M QUINA 2 3 MODALIDADES DE USO Existen tres moda lida des pa ra el uso de este equipo SMART 200 MP Carrete di m 200 mm 5 Kg SMART 200...

Page 7: ...Selector modo pulsaci n 2T 4T H Potenci metro de regulaci n inductancia I Regulaci n Intensidad MMA Regulaci n Tensi n de soldadura MIG MAG J Regulaci n velocidad hilo MIG MAG CAMBIO DE POLARIDAD En i...

Page 8: ...torcha debe estar a positivo 4 Si el material a solda r es aluminio cambie la sirga y el tubo gu a hilo por la sirga de grafito con la antorcha totalmente estirada 5 Seg n el di metro del hilo colocar...

Page 9: ...SMART 200 MP 9 10 Una vez encajado el hilo ya puede conectar la antorcha MIG MAG La carga del hilo a la antorcha se realiza mediante el pulsador de sangrado de hilo...

Page 10: ...fectamente fijada 5 Montar el manorreductor y conectar el tubo del gas comproba ndo que ste no tiene p rdida s a lo largo de todo el circuito 3 4 SOLDADURA DE ELECTRODO REVESTIDO MMA INSTALACI N Y PUE...

Page 11: ...DEBE FUNCIONAR Q UINA DEBE FUNCIONAR SIEMPRE CON LA SIEMPRE CON LA SIEMPRE CON LA SIEMPRE CON LA ENVOLVENTE P ENVOLVENTE P ENVOLVENTE P ENVOLVENTE PUESTA UESTA UESTA UESTA NO DESCONECTE LA M QUINA SI...

Page 12: ...azar ventilador El equipo esta situado en un ambiente muy c lido Evite un emplazamiento en donde la exposici n al sol sea directa Existe interiormente una conexi n floja Revisar conexiones el ctricas...

Page 13: ...ija operativa de fin de arco Evite cebar una longitud final de hilo excesivamente larga LA INTERVENCI N SOBRE EL EQUIPO DEBE SER REALIZADA POR PERSONAL ESPECIALIZADO TANTO AL COMIENZO COMO AL FINAL DE...

Page 14: ...de solda dura desprendiendo un humo que puede ser muy t xico Esto mismo puede suceder con aquellos materiales que incorporen alg n tipo de tratamiento superficial cincado galvanizado etc Ev tese en to...

Page 15: ...TANDARD WITH EQ UIPMENT SUPPLIED AS STANDARD WITH EQ UIPMENT DESCRIPTION Instructions Manual SMART 200 MP Input cable 3x4 mm2 1A V 3 m Plug incl Machine gas connection 2 m coupling Earth clamp cable W...

Page 16: ...CKET 2P 16A TT MAGNETOTHERMAL SWITCH 2P 16A 230V DIFFERENTIAL CIRCUIT BREAKER 2P 25A 300 mA ELECTRICAL SUPPLY INSTALLATION INDUSTRIA L CABLE PLUG SOCKET AND ELECTRICAL PROTECTION DEVICES CETAC 2P T 32...

Page 17: ...H CONNECTION INTO THE PLUG MAKE SURE THE MAINS VOLTAGE AGREES WITH THAT ESTABLISHED IN THE MACHINE 2 3 USING MODES Three moda lities for the use of this equipment exist SMART 200 MP Reel diam 200 mm 5...

Page 18: ...pole D Protection Led E ON Led F Selector MMA TIG MIG G Selector mode 2T 4T H Inductance regulation I Intensity regulaci n MMA Voltage regulaci n MIG MAG J Wire Speed regulaci n MIG MAG CHANGE OF POLA...

Page 19: ...elded is aluminium change the flexible cable and the wire guide tube for the graphite cable with the torch totally stretched 5 Depending on the wire diameter fit the groove of the suitable driving whe...

Page 20: ...astened 5 Install the pressure reducing valve and connect gas hose checking that there are no leakages throughout the whole circuit 3 4 COATED ELECTRODE WELDING MMA INSTALLATION AND START UP 3 4 1 MMA...

Page 21: ...PERATED WITH THE HO USING O N THE HO USING O N THE HO USING O N THE HO USING O N DO NOT DISCONNECT THE MACHINE IF IT IS HOT If you have finished the work do not disconnect the machine immediately wait...

Page 22: ...TCH LD1 O N THERE IS NO SWITCH LD1 O N THERE IS NO REACTIO N WHEN PRESSED REACTIO N WHEN PRESSED REACTIO N WHEN PRESSED REACTIO N WHEN PRESSED Failure of the pistol switch which does not make perfect...

Page 23: ...not be slowed down when it knocks against the piece The wire length at onset of welding process is too long Correct arc end operation Do not strike too long a final wire length SPECIALIZED PERSONNEL M...

Page 24: ...rocess giving off fumes which could be very toxic This can also occur with those materials which have some kind of surface coating zinc plated galvanised etc Avoid inhaling the fumes given off in the...

Page 25: ...el d instructions SMART 200 MP C ble d entr e 3x4mm2 1A V 3 m Sans fiche de raccordement Branchement machine gaz 2 m raccord C ble prise de masse Galet 37 0 8 1 0 mm V RECO MMAND S PO UR PRO C D MIG M...

Page 26: ...EUR DIFF RENTIEL 2P 25A 300 mA MISE EN APPLICATION INDUSTRIA L FICHE DE RACCORDEMENT SOCLE DE PRISE DE COURANT ET SYST ME DE PROTECTION DU R SEAU LECTRIQUE CETAC 2P T 32A SOCLE DE PRISE DE COURANT 2P...

Page 27: ...NDE CELLE DE LA MACHINE 2 4 MODALITI S D UTILISATION Trois moda lit s existent pour l utilisation de cette quipement SMART 200 MP Bobine di m 200 mm 5 kg SMART 200 MP avec Poste de travail portable SM...

Page 28: ...r de mode2T 4T H R glement de l inductance I R glement de l intensit MMA R glement de l tension MIG MAG J R glement de l vitesse du fil MIG MAG CHANGEMENT DE POLARITE Dans l int rieur en ouvrant un co...

Page 29: ...mat riau souder est en aluminium il faut changer le c ble et le tube guide fil pa r un c ble en graphite et une torche stri e 5 Selon le diam tre du fil poser la rainure de la roue d entra nement ada...

Page 30: ...ien fix e 5 Monter le d tendeur et brancher le tuyau du gaz en v rifiant s il n y a pa s de fuites tout au long du circuit 3 4 SOUDURE D ELECTRODE REV TU MMA INSTALATION ET MISE EN PLACE 3 4 1 INSTALA...

Page 31: ...PAS D BRANCHER LA MACHINE SI ELLE EST CHAUDE En fin d utilisation ne pas d brancher imm diatement la machine et attendre que le syst me de r frig ration int rieur la refroidisse compl tement MAINTENIR...

Page 32: ...t situ dans une ambiance tr s chaude viter un emplacement expos directement au soleil Il y a un branchement int rieur d tach R viser les branchements lectriques de puissance AVEC LA MACHINE EST BRANCH...

Page 33: ...Corrige l op ration de la fin de l arc vite l amor age d une longueur finale de fil trop longue L INTERVENTION SUR L QUIPEMENT DOIT TRE R ALIS E PAR UN PERSONNEL SP CIALIS AUSSI BIEN AU D BUT QU LA F...

Page 34: ...car ces derniers peuvent se d composer lors du proc d de souda ge d gageant une fum e qui peut tre tr s toxique Ceci peut galement arriver avec le mat riel qui a re u un traitement zingage galvanisat...

Page 35: ...KING ELECTRICAL DIAGRAMS PARTS DRAWINGS AND REFERENCE LISTS FORMULA FOR MAKING ORDERS FOR SPARE PARTS Indicate 1 Machine Reference and Serial no 2 Supply Voltage Frequency 3 No of pa rts description a...

Page 36: ...CONSTRUCTIONS AND ELECTROMECHANICAL CONSTRUCTIONS FABRICATIO N ET VENTE D APPAREILS DE SO UDAGE AUTO G NE LECTRIQ UE ET FABRICATIO N ET VENTE D APPAREILS DE SO UDAGE AUTO G NE LECTRIQ UE ET FABRICATI...

Reviews: