Power On
4-1
Chapter 4
System Operation and Monitoring
4.1 Power
On
Once all of the components have been installed into the 1430R-16F4Dand
the I/O ports or management interfaces have been connected, the subsystem
can be powered on.
4.1.1 Check List
BEFORE
powering on the subsystem, please check the following:
Memory module:
Memory modules have been correctly installed
on the controller boards.
BBU:
Make sure BBU(s) have been installed correctly, if used.
MUX Kits:
If SATA hard drives are going to be used on a dual-
controller subsystem, a MUX kit should be prsent on each hard
tray.
Hard drives:
Hard drives have been correctly installed in the drive
trays.
Drive trays:
All the drive trays, whether or not they contain a hard
drive, have been installed into the subsystem.
Cable connections:
The subsystem has been correctly connected
to host computer(s) or external cabling devices.
Power cords:
The power cords have been connected to the PSUs
on the subsystem and plugged into the main power source.
Ambient temperature:
All the subsystem components have been
acclimated to the surrounding temperature.