27
Pre-Delivery Plan and Checklist -
Your Spa’s Arrival
1.
Electrical requirements determined
Notes:
2.
Positioning requirements determined
Notes:
3.
Delivery site check (if needed)
Notes:
4.
Foundations complete?
Notes:
5.
Electrical concealed power feed complete? (If chosen)
Notes:
6.
Delivery booked?
Notes:
7.
Electrician booked (if needed)
Notes:
8.
Remove packaging -
find cover locks before disposing of packing
Notes:
9.
Install cover and cover locks
Notes:
10.
Install cover lifter
Notes:
11.
Install filters
Notes:
12.
Fill spa
Notes:
13.
Turn on
Notes: