19.
Apollo Sump & Module Assy 3000
Delivery Hose Lengths
89744 A/F&R = ¾ Hose @ 1.67m - ¾ Swivel Nut 19243/12/12/AU - F/Swivel 90 Elbow 1B243-12-12
89743 B/F&R = ¾ Hose @ 1.39m - ¾ Swivel Nut 19243/12/12/AU - F/Swivel 90 Elbow 1B243-12-12
89742 C/F&R = ¾ Hose @ 0.9m - ¾ Swivel Nut 19243/12/12/AU - F/Swivel 90 Elbow 1B243-12-12
Internal Supply Hose Lengths
89748 ¾ Hose @ 1.05m - ¾ Swivel Nut 19243/12/12/AU (x3)
Pipe Assys are as follows:
“A” = 89794 Internal Pipe Assy Upper
“B” = 89796 Internal Pipe Assy Middle
“C” = 89798 Internal Pipe Assy Lower
Note These Pipe Assys run up inside Ducting to connect to Vertical Pipe Assys attached to Column.
Module “C”
Module “B”
Module “A”
Front
Side
Column
End
852530
Solenoid Valve ¾ “
Encoder Assy
89869 (5m)
Module Mtg. Frame
Assy 89942
AC Control Box
Assy 89738 (5m)
Hinge Pin
89758
Manifold Delivery
Pipe
Assy 89792
89780
Module
Frame Assy
Meter Delivery Pipe
Assy. 83670 x 6
Power J/Box Assy
Cables Mains 4 core Link
@ A =1.8 m (89724
B = 1.5m (89723)
C =1.2m (89722)
Rear Side
Summary of Contents for Apollo 3000
Page 1: ...Apollo 3000 Set up Installation Parts Manual...
Page 2: ......
Page 4: ......
Page 15: ...11 Float Switch 89778 Float Swt Mtg Angle only 89749 Float Switch Bracket Assembly...
Page 26: ...22 Stage 1 Installation Procedure Sump Column Position Fig 2...
Page 27: ...23 file gme c docum pec apollo2 fig 2 manual doc Stage 1 Installation Service Area Spec Fig 3...
Page 28: ...24 Stage 1 Installation Procedure Mounting Positions Fig 4...
Page 29: ...25 Stage 3 Vent Box Installation Vent Box Position Sealing Spec Fig 5...