Operation Instructions
Installation Instructions
page 3
1. Remove the Top (B) from Body part (C) by unscrewing the 2 screw caps. Install the new GS Solar LED Light Bulb by
turning it into the bulb socket located at the top of the light clockwise. Bulb needs to be installed before lamp is
turned on.
NOTE:
When installing the GS Solar LED Bulb, hold it from its silver base not by the glass (Fig.3)
2. Turn the operation switch (Fig. 2) to either High or Low position according your preferences. The Solar Lamp will
automatically operate dusk to dawn.
3. Reattach the Top part (B) to the Body part (C) and secure with the 2 screw caps.
NOTE:
There are specific types of screws for specific
surfaces. If unsure of the appropriate type of screw to use
on your desired surface please consult a professional.
Pier Mount
1. Using the base as a template,use a drill to make two
holes in the desired surface
2. Place the white screw anchors into the holes, place
the lamp in line with the holes and secure with the
provided screws.
3. Screw in part G into part C as shown in Fig. 1.
Wall Mount
NOTE:
For best results, place your lamp in a spot facing
south.
1. Remove the silver bracket by removing the 2 screw
caps on the front face of the wall mount.
2. Screw the silver bracket onto the desired surface.
3. Place wall mount onto bracket and replace 2 wall
mount screw caps.
4. Slide part E through Part D as shown in Fig. 1.
5. Attach Part C to Part D by turning part E clockwise.
3" Fitter Mount
NOTE:
If you are replacing an existing gas/electric post
light, you must consult a certified technician to cancel
them before installation.
1. Screw part F into part C as shown in Fig. 1.
2. Position Part (F) on top of the existing 3” post and
tighten it using the screws provided. Tighten the 3 set
screws - do not over-tighten.
Fig. 2
Fig. 3
Fig. 1