Centric Installation Guide, rel. 4.7
12
3.
I
NSTALLATION
A
LL POWER CONNECTIONS MUST BE COMPLETED BY A LICENSED
ELECTRICIAN WHO IS EXPERIENCED IN WIRING THIS TYPE OF
EQUIPMENT
,
AND WHO IS FAMILIAR WITH THE LOCAL ELECTRICAL
CODES AND REGULATIONS
.
I
MPROPER WIRING MAY CAUSE INJURY TO PERSONNEL AND
/
OR
DAMAGE TO THE EQUIPMENT
.
3.1
Installation Checklist
Complete the following checklist as you perform the installation, initialization, configuration, and testing
procedures. Refer to the appropriate sections (specified in the
Reference
column) for detailed information
about each checklist item.
When the checklist is complete, send it to Gamatronic at support@gamatronic.com.
UPS model and configuration
Customer
Address
Site
Phone
Serial numbers:
System_________________Static Switch ____________________
Modules 1___________ 2___________ 3___________ 4___________5___________
6___________ 7___________ 8___________
Technician Name
Date
Signature
√
Operation
Requirement
Reference
V i s u a l I n s p e c t i o n
Verify the physical integrity of the system
No physical damage
Comments on visual inspection: __________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
S i t e P r e p a r a t i o n
– Ph ys ical
Check ambient temperature.
Recommended:
betw. +15 °C and +25 °C
(+59 °F and +77 ° F)
Min/max:
–10 °C and +40 °C
(+14 °F and +104 °F)
3.2.2 Step 1
Check humidity and condensation.
No condensation/dampness.
3.2.2 Step 2
Check ventilation.
Proper airflow to batteries.
3.2.2 Step 3
Check foundation and access.
Adequate structure and access.
3.2.2 Step 4
Check for adequate clearances.
3.2.2 Step 5
Comments on site preparation
–
physical: __________________________________________
_______________________________________________________________________________
_______________________________________________________________________________