40
P+ Premium SA, 15 kVA, rel. 1.4
2.
Turn on the circuit breakers for the
AC input
, the
Bypass input
, and the
Battery
. The UPS performs
a self test; this takes about a minute. Afterwards, you should see the following screen.
7.2.2
Verify proper number of input and output phases
Before turning the UPS on for the first time, verify that the UPS’s setting for number of input and output
phases is correct for your requirements. The phase setting can be seen on the second page of the Profile
screen, shown here with the phase setting highlighted.
See page 18 for instructions on how to display the Profile screen.
7.2.3
Set the output voltage
Before turning the UPS on, you must set the UPS nominal output voltage, if needed.
See “Changing the nominal output voltage” on page 43.
7.2.4
Set the system clock
Now set the system clock to the correct date and time.
See “Setting the system clock” on page 42.
7.2.5
Modify the screen contrast (optional)
You can modify the screen contrast, if necessary.
See “Setting screen contrast” on page 42.