Gamatronic Electronic Industries Ltd.
38
Power+ Technical Guide
“Module Location” DIP switch Settings
In the example shown the “FIRST UPS” DIP switch is set as follows:
1= "on", 2= "on", 3= "on", 4="on”, indicating UPS #1. See Table
Table
3-3:
DIP switch setup in a 100kVA system (
X = don't care).
Figure
3-29: DIP switch settings
Lowest Module Select (LMS) jumper
: The first module (UPS #1) must be assigned as such
by a jumper on the MOLEX-2 connector.
Other versions of the Control PCB may have a 2 level DIP switch instead of this connector, in
which case both switches must be ON.