Gamatronic Electronic Industries Ltd.
User Guide
Page 17
µ
PS Series 3:3 Phase 10kVA (GEMS)
Figure 11: Rear Mounting Bracket and Rear Angle Bracket
5.
Position the UPS in its final location.
6.
Drill an11mm hole in the floor at the location of each anchor bolt. (Drill
bit not included.)
7.
Bolt the front mounting bracket to the floor using 3/8” expansion anchor
bolts (item #15). (See Figure 12.)
Figure 12: Front Mounting Bracket