Silent Knight 9500/9800 Receiver Setup
Digital Receivers Installation and Configuration
17
FocalPoint™ Receivers Gateway Installation & Operation Manual - P/N: 53251:Rev: A 9/8/09
2.4 Silent Knight 9500/9800 Receiver Setup
A Receiver Gateway capable Workstation is capable of monitoring 10 Silent Knight 9500/9800
digital alarm receiver’s devices reporting alarm and trouble information. Digital receivers must be
installed according to the
“Digital Receiver Setup Guidelines” on page 11
.
2.4.1 9500/9800 Cable Configuration
Use the following figure to configure the serial cable running from the automation port of the
receiver to a non-dedicated COM port of the PC on which the Receivers Gateway is running:
Figure 2.4 Silent Knight Serial Cable Pinouts
2.4.2 9500/9800 Supported Formats
The following format is supported:
• ADEMCO Contact ID
• Receiver Settings and Configuration
NOTE:
All connections must be no more than 20 feet in length and run in conduit.
DB9 connector to non-dedicated
PC COM port
DB9 connector to Silent
Knight COM port
5 - GND to 5 - GND
4 - DTR
3 - Tx
2 - Rx
6 - DSR
NOTE: Pins 4 and 6 connect to
each other on the PC end
2 - Rx
3 - Tx