9 Easy Steps to Start-up Your New G&D Chiller 

Please view install videos online at 

www.gdchillers.com/installation-videos

 

Vertical Air Chillers

 

1. Chiller positioning: 

Clearance on all 4 sides of the chiller needs to be equal to one full width of the condenser

.

Electrical  code  may  dictate  greater  clearance.  There  should  be 

no obstructions above the chiller

.  Anchoring

required. Refer to the figure CHILLER CLEARANCE REQUIREMENTS for more details.

2. Install Wye-strainer (required) one size larger than mainline and purge valve on return line at chiller.

3. With the door switches in the OFF position, ensure all breakers are in the ON position. 

The chiller must then be

supplied with power for at least 4 hours. Verify there is a visible oil level in compressor sight glasses before
proceeding.

4. Flush all piping lines:

a. Ensure chiller start/stop door switch remains in the OFF position.
b. Open supply valve, close return and open purge valve. Turn control power door switch ON, then process

pump door switch ON and

 verify correct pump rotation

. Proceed with flushing the system. Once all

debris has been flushed from the system, remove as much water from system as possible.

5. Fill reservoir/ loop with 35% propylene glycol. Temporarily close the supply valve.

 Confirm glycol pressure shows

20 PSI

 using both the Carel controller and the manual pressure gauge located on the process pump discharge line

(refer to #9 if a lower pump pressure is required).

6. Open the supply valve, and circulate glycol through the entire loop for at least 30 minutes. Re-verify glycol mixture

using a refractometer. The glycol mixture MUST be 35 to 40 %. Correct as needed before proceeding.  

Re-verify

oil level in compressor sight glasses before proceeding. Do not proceed unless there is a visible oil level in the
compressor sight glass.

7.

Open all service valves/refrigerant ball valves in chiller marked with tags

: Suction/discharge of each compressor,

and refrigerant ball valves at receiver. Models with remote condensers will have additional valves. Contact us for
more details as needed: 800-555-0973.

8. Turn chiller start/stop door switch the RUN position. Compressors should start to run. Fans to follow shortly.

9. Adjusting set points on Carel controller: Press the up/down arrows until SET displays in bottom right corner. Press

enter and change the temperature to desired set point. Pump pressure adjustment is also located here for the
VFD. If decreasing the pressure is required for tank jacket rating, do so using the Carel controller at this time.

PLEASE VISIT GDCHILLERS.COM TO VIEW OUR INSTALLATION VIDEOS & FAQS 

*G&D Chillers welcomes any and all questions or concerns. We can be reached at

 800-555-0973 

or

 541-345-3903

GD-9ES_VA-r202

2

Summary of Contents for VERTICAL AIR Series

Page 1: ...1 800 555 0973 INFO GDCHILLERS COM GDCHILLERS COM INSTALLATION VIDEOS CHILLERINSTALLATION GUIDE USER MANUAL VERTICAL AIR SERIES...

Page 2: ...I 2 VERTICAL AIR SERIES CHILLER MANUAL 2022 G D CHILLERS INC ALL RIGHTS RESERVED...

Page 3: ...LER DESCRIPTION 7 INSALLATION OVERVIEW 8 INSTALLATION REQUIREMENTS AND CONTRACTOR RESPONSIBILITIES 9 INSTALLER SUPPLIED COMPONENTS 9 CHILLER INSTALLATION MECHANICAL 9 PIPING RECOMMENDATIONS 11 ELECTRI...

Page 4: ...HECKLIST 22 TERA 23 MODEL INFORMATION 24 UNIT NAMEPLATE 24 COMPRESSOR NAMEPLATE 25 COMPRESSOR INFORMATION 25 COMPRESSOR REPLACEMENT 26 POWER SUPPLY WIRING 28 MAINTENANCE 30 MAINTENANCE CHECKLIST 33 TR...

Page 5: ...the main office at 1 800 555 0973 The voicemail recording will provide contact information for the emergency on call service technician INSTALLATION VIDEO LINKS Visit the following pages for installat...

Page 6: ...the damage did not occur after delivery Notify the carrier s terminal of the damage immediately by phone and by mail Request an immediate joint inspection of the damage with the carrier and the consi...

Page 7: ...pressure design allows circuiting back to tank without damage to system or pump Copper and bronze construction REFRIGERANT PIPING Type L ACR copper Liquid line filter drier sight glass moisture indic...

Page 8: ...copper wire Size wire and according to any all applicable local and national codes Refer to chart to the right for proper torque values Refer to spec sticker on control panel for all electrical rating...

Page 9: ...l interconnecting wiring in conduit for field supplied devices Unit disconnect fused CHILLER INSTALLATION MECHANICAL LOCATION REQUIREMENTS SOUND CONSIDERATIONS Refer to G D data sheet for sound data L...

Page 10: ...voir Be sure to provide additional vents at high points in the piping to bleed air from the chilled fluid system Do not pressurize reservoir Install necessary pressure gauges to monitor the entering a...

Page 11: ...enclosure Use closed cell foam insulation Install protective cladding Materials Schedule 80 PVC or ABS typical for cold glycol water systems Verify operating temperatures High temp systems may requir...

Page 12: ...UNION BALL VALVE TRUE UNION BALL VALVE SUPPLY RETURN DETAIL F SCALE 1 11 PIPE REDUCER TRUE UNION BALL VALVE SCH 80 PVC PIPE ELECTRONIC ACTUATED VALVE CHECK VALVE SUPPLY RETURN AIR BLEED VALVE VACUUM...

Page 13: ...wiring 30V in conduit with conductors carrying more than 30 volts SEQUENCE OF OPERATION 1 Chiller supply and return ball valves should always be open during normal operation 2 Fluid bypass valve is f...

Page 14: ...chiller products The chiller uses brazed plate evaporators and an air cooled condenser The compressors use suction gas cooled motors and an oil management system to provide almost oil free refrigeran...

Page 15: ...pump pressure set point b Press ENTER button to navigate to numerical readout and adjust with UP and DOWN to set pump pressure Please note that pressure setpoints are preset Info screens 1 Ensure you...

Page 16: ...24 59 269 3 74 8 6 15 8 9 9 A B 521 C D 2 E 03 15 4 8 8 F G15 H9 2 I1 J K LM I G K NO 5 G K NO JP MQ R L C C F S LMT G3 9 2 521 O U 8 9 V 8 2W 8 8 Q F XY Y Y F Q N F Z F N S N F F L F N N T NLLQC 9M...

Page 17: ...x w t 0x M K B A A B B G 2 6 P 2 rH 53pg A K g1 _ L G B G 6 k z 3 2 6A B H 2 r A K 53pg I G B A I K G BG 2G P 2 2 B G A K g1 _ K G B 26 gG C A EGK KK G A B B A K K 2 C AA 6 G 3 J 3 4 M s l k 12 P A L...

Page 18: ...START UP PROCEDURES POWER UP When power is applied to the chiller the HMI will boot up to the main screen The chiller will start if both the control power switch and the chiller start stop switch are...

Page 19: ...ula to maintain the fluid temperature as close to the set point as possible At times the compressors may continue to run even if the fluid temperature is below the set point This is normal Note Once t...

Page 20: ...e servicing could result in death or serious injury FREEZE PROTECTION The chiller system must be protected from freezing by use of a freeze inhibitor The solution must be strong enough to provide prot...

Page 21: ...irm glycol pressure shows 20 PSI using both the Carel controller and the manual pressure gauge located on the process pump discharge line refer to 9 if a lower pump pressure is required 6 Open the sup...

Page 22: ...ROTATION GLYCOL PRESSURE COMPRESSOR A COMPRESSOR B COMPRESSOR C COMPRESSOR D CRANK CASE HEATER ENGERGIZED 4 HOURS COMPRESSOR OIL LEVEL MOTOR AMPS L1 L1 L1 L1 L2 L2 L2 L2 L3 L3 L3 L3 SUPERHEAT F 30 F...

Page 23: ...m integrates with your chiller to monitor and remotely display chiller parameters for glycol supply and return temperatures pressure and flow It also sends SMS text alerts for any abnormal conditions...

Page 24: ...fficient temperature control Each refrigerant circuit is provided with a removable core filter drier sight glass electronic expansion valve and charging valves The evaporator is a brazed plate or shel...

Page 25: ...t kit and determine whether the compressor failure was mechanical or electrical This is important because it dictates correct cleanup procedure COMPRESSOR OPERATIONAL PUMP DOWN The operational pump do...

Page 26: ...n to the compressor s COMPRESSOR ELECTRICAL TERMINAL BOX Be sure to protect the terminal box and all wiring when un brazing or brazing compressor refrigerant piping connections COMPRESSOR REPLACEMENT...

Page 27: ...BB VFD 1 Press the menu button 2 Arrow to FAULT LOGGER 3 Press the top right button indicating ENTER NOTICE DO NOT CLEAR FAULTS WITHOUT DOCUMENTING FAULT DESCRIPTION AND CONTACTING G D CHILLERS TECHNI...

Page 28: ...d one hour open time Plug the open refrigerant line to minimize moisture absorption Always change the liquid line filter drier Evacuate the system to 500 microns or below Remove pressure transducer an...

Page 29: ...Excessive voltage imbalance between the phases of a three phase system can cause motors to overheat and eventually fail The maximum allowable imbalance is 2 percent UNIT VOLTAGE PHASING It is importa...

Page 30: ...ottom of compressor monthly Inspect for any oil leaks Verify pump function quarterly Confirm glycol supply pressure Listen for abnormal sounds from the pump Verify thermostat function quarterly Check...

Page 31: ...late heat exchanger BPHX evaporators with factory installed electronic flow switch that is positioned in the evaporator fluid outlet pipe Note Strainer maintenance is critical to proper operation and...

Page 32: ...A or R448A refrigerant Use only manifold gauge sets designed for use with R404A or R448A refrigerant Use only refrigerant recovery units and cylinders designed for use with R404A or R448A refrigerant...

Page 33: ..._________________ MAINTENANCE CHECKLIST PERFORM EVERY 3 MONTHS A B C D E F G Glycol Pressure Glycol Level Glycol Mixture Fan Function Fan Amps Pump Function Pump Amps Pump Rotation Compressor Function...

Page 34: ...Function Breaker Function SuperHeat Check All Capacitors Inspect All Terminations Tightness Burns Check TXV Bulbs Insulation Integrity Cosmetic Integrity Skin Screws Knobs Cap Tube Silicone Wire Zip...

Page 35: ...PARTS LIST Quantity Additional Comments Yh Zd Z z WZ s Ed s D Ed E E...

Page 36: ...d recharge Plugged filter drier Replace filter drier Insufficient subcooling Check condenser subcooling circuit 4 Suction pressure too high Glycol temperature will not reach set point Excessive load o...

Page 37: ...Restart 3 ph compressor by switching 2 phases replace if it does not restart 9 Compressor starts but start relay does not drop out High running current overload trips Incorrect wiring of start compon...

Page 38: ...ve LLSV Replace LLSV Leaking compressor valves Replace compressor Undercharged system Check for leaks and recharge 13 Internal pressure safety valve IPRV opens Refrigerant trapped in compressor Discha...

Page 39: ...t 1 Parameter Cb17 AL108 Circuit 1 Envelope High suction pressure A Stop circuit 1 Parameter Cb17 AL109 Circuit 1 Envelope Low compression ratio A Stop circuit 1 Parameter Cb17 AL110 Circuit 1 Envelop...

Page 40: ...sure A Stop circuit 2 Parameter Cb18 AL211 Circuit 2 Envelope Low discharge pressure A Stop circuit 2 Parameter Cb17 AL212 Circuit 2 Envelope Low suction pressure A Stop circuit 2 Parameter Cb17 AL213...

Page 41: ...N B C C D S C U N C C S D N G N Y D S F D M N X N H E G M E Z E A N O C C S D N G N Y D S F D D U A E G E D D N U E N M E Y M N X D U N C N F N G A B Y N V N T B C D N H B D U A E G P _ V _ RX D K a...

Page 42: ...is longer Any upgrade to the original product will be covered only for the duration of the original warranty period EXCLUSIONS This warranty does not cover for example abuse accident acts of God consu...

Page 43: ...CABLE LAW G D CHILLERS INC DOES NOT WARRANT THAT THE OPERATION OF ANY PRODUCTS COVERED UNDER THIS LIMITED WARRANTY WILL MEET YOUR REQUIREMENTS OR THIRD PARTY SERVICES BE UNINTERRUPTED ERROR FREE OR TH...

Page 44: ...INSTALLATION GUIDE USER MANUAL SINGLE DUAL STAGE MODELS 44 G D Chillers welcomes any and all questions or concerns We can be reached at 800 555 0973 or 541 345 3903...

Reviews: