STRONG. SIMPLE. COMPACT.
Rev Date 23 0610
800.285.6780 sales@ggled.net
EDGE
INSTALLATION MANUAL PAGE 5
CONTROLLER INSTALLATION & ELECTRICAL CONNECTIONS
Notes
•
The
EDGE
Power/Data Translator (PDT) board distributes power to the LED fixtures and the optional
ColorWash control board.
•
If installed, the ColorWash control board manages network connectivity, show/effect generation
and other controls.
Power Circuits / Wiring / Circuit Breakers
The EDGE system is compatible with 120V and 277V single phase power systems. The EDGE system needs to
have power supplied to it from the building’s breaker box to the three AC VOLTAGE IN terminals (LINE, NEUT,
GRND) at the bottom of the board below the driver fuses. The input circuit shall be supplied with a 20A breaker
on 120V systems or a 15A breaker on 277V systems.
Power/Data Translator (PDT) Board
•
The AC Input terminal blocks (120V/277V) feed 1 or 2
externally mounted AC/DC drivers, depending upon
the PDT configuration. These are installed and wired
at the factory.
•
The drivers supply 48VDC to the 4 LED Output
terminal blocks. See table on page 6 for maximum
fixture connection details.
•
One PDT board represents one DMX512 universe;
the maximum number of fixtures that can be run
off one universe depends on the amount of power
available from the drivers.
•
Each leader cable must be terminated at its own
LED output terminal block.
•
A
Reset
(Boot) Button S1
is located below the
Single Driver Jumper terminals on this board.
See the picture to the right.