Page 8 of 19
Step# 6
(First Guide Shut-Off Lever Assembly)
1. Slide the first guide rod bracket (28362-2) over the 90° bent end of the shut-off rod and rotate around the
corner of the shut-off rod. Now slide guide all the way down the shut-off rod to the farthest hole down on
the square tube. When in place the tab with small slot will be on the opposite side of the square tube as
the shut-off rod as shown in Diagram #14.
2. Fasten the guide in place as shown in diagram #15 using the listed hardware. Do not tighten bolt.
Diagram #13
Diagram #14
Diagram #15
2836-A12