GAT ECO.Side Lock 7000 BA / NW BA
Installation
www.gantner.com
HB_GAT-GAT-ECOSide-Lock7000-BA--EN_14
23
Installation Requirements for the GAT ECO.Side Lock 7000 BA and Non-Metallic Doors
During installation, please pay particular attention to the following points:
-
When the door is pressed shut, ensure there is no gap between the bolt set (2) and the front of the GAT ECO.Side
Lock 7000 BA. Ideally the bolt set should touch the front of the lock (see Figure 3.9).
-
The locker door, the bolt set, and the front side of the GAT ECO.Side Lock 7000 BA must be perpendicular and
parallel to each other. If not, the door contact in the GAT ECO.Side Lock 7000 BA can potentially not function
correctly.
-
If right and left-hinged locker doors are in use together, please note the correct LED position. The GAT ECO.Side
Lock 7000 BA is mounted upside-down on left doors in comparison to right doors.
Figure 3.10 - LED positions of the GAT ECO.Side Lock 7000 BA for right and left-hinged doors
NOTE!
Before installing all locks in a new locker system, a test installation of one lock into a completed locker and
a function check must be performed. See section “3.3 Test Installation”.
Summary of Contents for GAT ECO.Side Lock 7000 BA
Page 63: ......