Introduction  

• Construct and secure the base before assembling the greenhouse.  
• The base must stand on a firm level surface.  
•  If  mounted  on  earth,  ensure  the  soil  is  well  compacted  and  level.  Secure  the  base  using  the 
ground pegs provided: these need to be set into pockets of concrete.  
• The base can be mounted on slabs provided they are level and are firmly laid.  
•  A  concrete  pad  can  also  be  used:  ensure  that  it  slopes  off  to  the  sides  to  prevent  water  ingress 
around the edges.  
 

Tools and equipment required:  
• 10mm spanner.  
• Spirit level.  
• Tape measure.  
• Cement and ballast for the fixing pockets.  
• Drill, masonry bits, screws and plugs if securing to slabs or a concrete pad. 
 

Section 1 

Assembly: 
• Bolt the corner joints (H2) to the frames as shown. Fig A. • Lay 
the base in position and check with a spirit level that it is  
  level all round, adjusting as necessary. 
• Check that the base is square before securing to the ground. This  
  is easily done by measuring the diagonals: these will be the same  
  length when the base is square. 

Section 2 

Fig B 

Securing the base on soil: 

Fig A 

H2 

Concrete pocket  

• Dig holes for concrete pockets. These should be deeper than the length of the  

ground  pegs  and  need  to  be  positioned  at  each  corner  and  also  adjacent  to 
each greenhouse upright.  

• Apply 2 pegs at the corners and one peg elsewhere next to an upright. Ensure the 
pegs are inserted at an angle, as shown. Fig B.  

Section 3 

Fig C 
 
 
 

Section 4 

Securing the base on concrete or slabs: 
• Drill through the base frame as illustrated. Fig C
•  Drill  and  plug  the  concrete  or  slab,  ensuring  that  the  hole  is  made  far  enough  
  away from the edge to prevent splitting. 

Greenhouse 

Mounting the greenhouse: 
•  Wait  until  all  concrete  is  fully  set  before  mounting  the  greenhouse  
  on the base. 
•  Apply  the  clips  (H3)  to  the  sides,  including  the  corners,  and  at  
  the ends. 
• Undo the nuts at the bottom of the greenhouse corners & vertical  
  glazing bars. Hook clips under base rim and over the bolts before  
  re-attaching and tightening the nuts. 
•  Check  that  the  greenhouse  is  firmly  secured  and  all  nuts  are  
  tightened. 
 
 

 
 
 
 
 

frame parts 

H1 

H3  

 

Summer Garden Buildings does not guarantee that this is the most recent version of these instructions or that all data has been 
accurately reproduced. You are advised to refer to the instructions supplied with the product before assembly. If for any reason 
the instructions are not delivered with the product you are advised to obtain the most recent version before assembly. No 
guarantee is given regarding the accuracy of these instructions and no liability will be accepted for any errors or inaccuracies.

 