13-18-612 Page 19
3-1
SECTION 3
STARTING & OPERATING PROCEDURES
N
N
N
O
O
O
T
T
T
I
II
C
C
C
E
E
E
Read the Operator’s Manual before operating the compressor.
PRESTART-UP INSTRUCTIONS
- A new unit as received from the factory has been tested and then
prepared for shipping only.
DO NOT
attempt to operate the unit until checked and serviced as follows:
1.
Compressor Oil
- Check the oil level in the sump
– with unit stopped, the sight gauge should be full
or nearly so. Add oil, with unit stopped and depressurized, only if the sight gauge does not show an
oil level during steady, warm operation. Do not mix different type oils. When the unit is shipped, it is
filled with Gardner Denver AEON™ 9000SP lubricating coolant, suitable for the first 8000 hours under
normal operating conditions. See Section 5 for more details on the compressor oil system.
N
N
N
O
O
O
T
T
T
I
II
C
C
C
E
E
E
Regular maintenance and replacement at required intervals of the oil filter, air filter and
air/oil separator is necessary to achieve maximum service and extended drain intervals
of AEON 9000SP synthetic lubricating coolant. Use only genuine Gardner Denver
filters designed and specified for this compressor.
N
N
N
O
O
O
T
T
T
I
II
C
C
C
E
E
E
Whenever the oil is drained from the compressor (e.g., due to oil change or
compressor replacement), a minimum amount must be replenished to lubricate and
seal rotors during the start-up phase. Temporarily remove the flexible hose between
the air filter assembly and the intake poppet valve and add 1.5 gallons of oil through
the intake valve opening.
Summary of Contents for AirSmart VS80-110B
Page 33: ...13 18 612 Page 32 4 7 300CGE546 04 Ref Drawing Page 2 of 4...
Page 34: ...13 18 612 Page 33 4 8 300CGE546 04 Ref Drawing Page 3 of 4...
Page 35: ...13 18 612 Page 34 4 9 300CGE546 04 Ref Drawing Page 4 of 4...
Page 37: ...13 18 612 Page 36 4 11 301CGE546 B Ref Drawing Page 2 of 4...
Page 38: ...13 18 612 Page 37 4 12 301CGE546 B Ref Drawing Page 3 of 4...
Page 39: ...13 18 612 Page 38 4 13 301CGE546 B Ref Drawing Page 4 of 4...
Page 41: ...13 18 612 Page 40 4 15 302CGE546 05 Ref Drawing Page 2 of 4...
Page 42: ...13 18 612 Page 41 4 16 302CGE546 05 Ref Drawing Page 3 of 4...
Page 43: ...13 18 612 Page 42 4 17 302CGE546 05 Ref Drawing Page 4 of 4...
Page 45: ...13 18 612 Page 44 4 19 303CGE546 B Ref Drawing Page 2 of 4...
Page 46: ...13 18 612 Page 45 4 20 303CGE546 B Ref Drawing Page 3 of 4...
Page 47: ...13 18 612 Page 46 4 21 303CGE546 B Ref Drawing Page 4 of 4...
Page 70: ...13 18 612 Page 69 9 2 Figure 9 1 MINIMUM DISCHARGE PRESSURE CHECK VALVE...
Page 86: ...NOTES...
Page 87: ...NOTES...