5 Design and functioning
21
•
This way, no more compressed air will be supplied
to the mains.
•
If the mains pressure does not drop to the target
value within the programmed follow-up time, then
the system will shut down.
•
If the target value is achieved before the expiration
of the programmed motor follow-up time, then the
magnet valve will again be energized (-25-(Y4)).
•
The system will then go into load runs.
Summary of Contents for EnviroAire 15
Page 1: ...Original Operating and Service Manual 15 22 kW USA Id no ZS1093133 00 June 2012...
Page 2: ......
Page 52: ...12 Annex 50 Fig 29 all dimensions in Inches...
Page 53: ......
Page 54: ......
Page 55: ......